News & Event
New Plant and New Vision: Forward to A New Journey
2025.04.24
Recently, the main structure of our newly invested Heping Plant has been completed, with construction now in the final stages of supporting facilities. In accordance with our preliminary plan, the company's intelligent equipment production line has been fully relocated to this new plant.

The Heping Plant covers an area of approximately 63 mu, with the construction of factories, warehouses, and supporting facilities. The total construction area is 40,137.98 square meters, mainly producing various high-precision high-end intelligent CNC equipment. Its planning fully integrates modern industrial design concepts and green sustainable development needs. The newly built intelligent factories are equipped with automated conveyor belts and CNC turnover areas to meet the needs of multi-category and flexible intelligent manufacturing; And based on functional requirements, the assembly area and storage area were independently divided, achieving an integrated closed-loop from production to packaging. The roof of the plant is equipped with a PV power generation system to provide green energy for the enterprise. Ecological green belts and sound barriers are also built around the plant to achieve harmonious coexistence between industry and nature. Digital technologies of the new era collaborate with time-honored craftsmanship to optimize production processes. This convergence of innovation and tradition forms the most profound driving force behind the enterprise's evolution.

Relocation is not only the transfer of physical space, but also represents the iterative upgrading of the manufacturing system. This new site will serve as both fertile ground and a vast stage where all at Hengerda can pursue their ambitions and fully apply their talents.